BHC Ltd: Holborn Viaduct Project
A commercial building project incorporating low-carbon procurement, renewable-energy fabrication, and digital carbon tracking.
Robert Bird Group: St Marys Integrated Project Office
A temporary project office designed for disassembly and reuse across multiple life cycles.
Tata Steel Limited: Tata Central Hospital
A 60-bed secondary care hospital serving the West Bokaro collieries region in India.
Innovation of the Year
InQuik Pty Ltd: Rebuilding Murphys Bridge
A bridge replacement project using prefabricated modular construction systems.
PF Engineering Pvt. Ltd.: Mahatma Gandhi Setu Superstructure
Construction of the steel superstructure for a multi-span bridge over the Ganga River in India.
RJC Engineers and Walters Inc.: One Bloor West – Modular Composite Columns
Application of prefabricated composite columns in a high-rise building in Toronto, Canada.
The Takigami Steel Construction Co., Ltd.: Kagiya Overbridge
Overnight erection of a half-through Nielsen-Lohse steel bridge in Japan.