CSCEC Steel

Website: https://sstr.cscec.com/english31/

Dubai Hassyan Power Plant

CSCEC Steel – China

  • Dubai Hassyan Power Plant is the largest clean coal power plant in the Middle East, located in the Saih Shuaib area on the Arabian Gulf coast of Dubai, with a site area of 2.25 million square meters.
  • It is an important part of the UAE’s energy security strategy and a key project for CSCEC to successfully
    implement the “going out” strategy of Chinese enterprises under the “Belt and Road” initiative and adopt the international capacity cooperation model. This project is a solution to solve the demand for electricity.

Characteristics

  • Steel Tonnage : 77,000 tons
  • Length of Main workshop : 383.6m ; (Height : 64m)
  • Length of Dry Coal Shed : 650m ; (Height : 40m)

Categories

Infrastructure, Restoration Solution

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here