Accelerated Bridge Construction using Magnelis® Steel

ArcelorMittal – Luxembourg

  • InQuik accelerates global bridge construction internationally with its revolutionary, standardized, and pre-certified solution. The system enables mass production and easy transport of single- to multi-span bridges worldwide, offering a fast,
    resilient, low-risk, and cost-effective construction method.
  • The installation process is notably quicker, lightweight components are easily delivered onsite, placed into position, and subsequently filled with concrete. A small crane and a few days of work suffice for bridge completion using basic labor skills.
  • The InQuik system employs more steel compared to traditional reinforced concrete bridges. Despite this increased steel usage, the bridges remain cost-effective due to their prefabricated nature. This financial advantage is primarily attributed to reduced installation time and labor requirements, diminished risk factors, and decreased crane usage. In essence,
    the InQuik system is a long-lasting bridge solution that represents a pioneering approach to bridge construction, combining efficiency, innovation, resilience and significant cost benefits for the community.

Characteristics

  • Superior Corrosion Resistance
    -Magnelis® provides long-term protection against rust, even in harsh environments.
  • High Durability Under Concrete Pressure
    – Withstands pressure and chemical exposure from fresh concrete, ensuring lasting formwork performance.
  • Aesthetic Surface Finish
    -Offers a clean, visually appealing surface, ideal for exposed structures like bridges where appearance matters.
  • Chemical Containment Capability
    – Effectively contains plasticisers and water-soluble chemicals in concrete, preventing environmental contamination.
  • Reduced Zinc Consumption– Uses less zinc than conventional coatings, preserving natural resources and lowering environmental impact.
  • Sustainable and Cost-Effective
    – Extended lifespan, reduced maintenance, and lower material waste make it a sustainable and economical solution over time.

Applications

NO PROJECT YEAR
1 Beargrass Creek Bridge 2023
2 Bio 1 Bridge 2023
3 Silo Farm Bridge 2023
4 Murphy’s Bridge 2022
5 Frampton Bridge 2022
6 Koloona Bridge 2022
7 Belimbla Bridge 2021
8 Fowler Bridge 2021
9 Sinclair Bridge 2020
10 Parsonage Creek Bridge 2019

 


Categories

Restoration Solution, Road & Bridge

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here