CSCEC Steel

Website: https://sstr.cscec.com/english31/

Boardwalk underneath Island Eastern Corridor

CSCEC Steel – China

  • The Boardwalk Bridge is a major waterfront improvement project in Hong Kong Island and an important
    infrastructure project for the people’s livelihood. Once completed, it will form a continuous 12-kilometer-long waterfront promenade for public recreation. The Sakanodō Bridge consists of 62 modules in total, with only four bridge sections assembled on-site, and the modular assembly accounts for over 90%. The project is a solution to transform the space beneath the Eastern Harbour Crossing into a new multi-functional
    leisure destination.

Characteristics

  • Steel Structure : 9,500 ton
  • Total Length : 12 km
  • Max Span : 20.1 m

Applications

Hong Kong Eastern District Pedestrian Bridge

Hong Kong Eastern District Pedestrian Bridge MB01


Categories

Restoration Solution, Road & Bridge

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here