BESTECH CONSULTANT ENGINEER – India

Guest house-cum-Marriage hall in Assam

Building use

Other

Country/Region

All Regions

Overview

Composite construction was adopted to shorten construction time and to ensure strength and more life expectancy of the building.


Basic information (construction date, number of stories, gross floor area, adopted design code, engineer(s), Contractor(s), etc.)

Construction date: 2012
Number of stories: 2
Gross floor area: –
Adopted design code: Eurocode3; IS456:2000; IS800:2007; IS875; IS1893
Engineer(s): Debashis Datta
Contractor(s): Aveecons


Issue and/or innovation

Composite construction made the design cost effective.


Reason for composite solution

To shorten construction time and to ensure strength and more life expectancy of the building.


Impact or effectiveness

The benefits of composite construction was proved and the design and construction of composite structure satisfied the requirements of the client.


Categories

Building, Beam

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here