Solutions for Beam

Study on lateral buckling behavior of steel beam with concrete slab

Kajima Corp. – Japan

A method to rationalize the arrangement of lateral bracing members based on the effect of the floor slab has been developed.

Office building in Fortaleza

Engineer appointed by Gerdau – Brazil

The building was designed to be the new icon of Fortaleza that will expand the concept of urban kindness and with an environmentally friendly concept.

Shopping center in Taguatinga

Engineer appointed by Gerdau – Brazil

The composite solution was chosen considering the optimized best technical solution.

Stadium in Belo Horizonte

Engineer appointed by Gerdau – Brazil

The composite solution was chosen considering the optimized best technical solution.

Office building in Gdansk

Iuav University of Venice – Italy

The Wave complex, consisting of two independent buildings, is being developed in the Oliwa district of Gdańsk.

Office building in Bydgoszcz

Gąska Studio – Poland

The building is a speculative investment of a local developer.

Office building in Essen

ECE Projekt management GmbH – Germany

The building serves as the headquarters for Thyssenkrupp.

Museum in Leiden

Aronsohn consulting engineers – Netherlands

The project consists in the renovation and expansion of the Naturalis Biodiversity Center in Leiden.

Office building in Barcelona

MC2 Ingeniería – Spain

The building serves as headquarter for the Telefonica company and at the same time hosts a public space in the lower portion of the tower.

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here