Passenger terminal of train station in Madrid

MC2 Ingeniería – Spain

The project described is the first part of a multi-stage extension project of the Madrid Atocha train station passenger terminal, to manage a two fold increase in passenger traffic in about 10 years.

Parking for cableway system in Idre

Iuav University of Venice – Italy

The project is for the construction of an underground parking and maintenance space for the cableway system in a ski resort.

Hospital in Udine

Studio d'ingegneria Suraci – Italy

The building is the “Laboratory and Analysis” hub of the Udine Hospital.

TSC beam, PSRC column, and TSC-PSRC joint

Sen Engineering Group – South Korea

By developing innovative patented methods in the construction field (TSC beam, PSRC column, and TSC-PSRC joint), we aim to increase on-site productivity, secure economic efficiency, minimize on-site manpower, and shorten construction periods.

Office building in Paris

EVP Ingenierie – France

The building serves as the new office building for about 100 staff of the administrative staff of the Parc de la Villette, an important green area in the city of Paris.

Social Housing – Gymnasium in Paris

ANTOINE REGNAULT ARCHITECTURE – France

The renovation of the Ilot-Saint Gemain in Paris includes the creation of 254 social housing units, a kindergarten and a gymnasium.

Warehouse in Incheon

ACT Partner Co., Ltd. – South Korea

In this project, the following requirements were to be satisfied: – Minimize the depth of beams and the size of columns to secure warehouse space while satisfying the building height restrictions of the law – Minimize floor deflection and vibration – Also the structure must be clean without protrusions as there is no finishing material on the face of columns

Composite connections and composite slab

Engineer appointed by Gerdau – Brazil

Innovative tests related to performance were carried out in partnership with a Brazilian University (UFMG) to test composite connections and also with a laboratory in England to test composite slabs at elevated temperature.

Office building in Nove Lima

Engineer appointed by Gerdau – Brazil

The composite solution was chosen considering not only the optimized best technical solution (building height, gravitational/lateral forces applied, lateral resistance system adopted), but also the total cost, erection time-consuming and time to get the raw material from providers as well.

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here