Solutions for Brace

Office building in New York (Hearst Tower)

John Hopkins University – United States

The diagrid system and concrete filled steel tubes were adopted to design a renewal of the landmark Hearst Tower (first built in 1928) with the use of a diagrid system to address new seismic requirements.

Shopping center in Taguatinga

Engineer appointed by Gerdau – Brazil

The composite solution was chosen considering the optimized best technical solution.

Stadium in Belo Horizonte

Engineer appointed by Gerdau – Brazil

The composite solution was chosen considering the optimized best technical solution.

Residential in Rotterdam

ABT B.V. Ingenieursbureau Delft – Netherlands

The building is a luxury residential development composed of a portion of “sky apartments” in the upper section and a portion of “city apartments” in the lower portion of the tower.

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here