Solutions for Floor (slab)

Hospital in Udine

Studio d'ingegneria Suraci – Italy

The building is the “Laboratory and Analysis” hub of the Udine Hospital.

Office building in Rovereto

Premetal – Italy

The building stems from the site of a pre-existing industrial facility in a very central area of the valley where Rovereto is set.

Office building in Frankfurt

Bollinger+Grohmann – Germany

The building is the first mixed use building in downtown Frankfurt, introducing 147 residential units in an area of the city that is usually abandoned during the night and weekends.

Office building in Hernani

MC2 Ingeniería – Spain

The building is the headquarter of the Orona Lift Industry, as well as the central point of a new campus creating a place that is both a flagship and a common home for its more than 4,500 employees and a hub for researchers and students on its vertical transportation, urban mobility, energy and technology branches.

Office building in Nove Lima

Engineer appointed by Gerdau – Brazil

The composite solution was chosen considering not only the optimized best technical solution (building height, gravitational/lateral forces applied, lateral resistance system adopted), but also the total cost, erection time-consuming and time to get the raw material from providers as well.

Composite Beams with Hollow Core Slabs

Engineer appointed by Gerdau – Brazil

To contribute to expanding the knowledge and consolidate the use of composite structures providing guidance on the design of composite beams where steel rolled shapes acts compositely with hollow core precast slabs.

Office building in Sydney (Salesforce Tower)

UNSW, Sydney – Australia

Salesforce Tower (Sydney Place) is the first steel framed high-rise built in Sydney in the last 25 years.

Office building in Sydney (Quay Quarter Tower)

UNSW, Sydney – Australia

Quay Quarter Tower involves the upcycling of the original building which was completed in 1976.

Residential and hotel in Sydney (Greenland Centre building)

UNSW, Sydney – Australia

The Greenland Centre utilised the refurbishment of the original building which was completed in 1965.

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here