Solutions for Building

TSC beam, PSRC column, and TSC-PSRC joint

Sen Engineering Group – South Korea

By developing innovative patented methods in the construction field (TSC beam, PSRC column, and TSC-PSRC joint), we aim to increase on-site productivity, secure economic efficiency, minimize on-site manpower, and shorten construction periods.

Office building in Frankfurt

Bollinger+Grohmann – Germany

The building is the first mixed use building in downtown Frankfurt, introducing 147 residential units in an area of the city that is usually abandoned during the night and weekends.

Office building in Paris

EVP Ingenierie – France

The building serves as the new office building for about 100 staff of the administrative staff of the Parc de la Villette, an important green area in the city of Paris.

Social Housing – Gymnasium in Paris

ANTOINE REGNAULT ARCHITECTURE – France

The renovation of the Ilot-Saint Gemain in Paris includes the creation of 254 social housing units, a kindergarten and a gymnasium.

Warehouse in Incheon

ACT Partner Co., Ltd. – South Korea

In this project, the following requirements were to be satisfied: – Minimize the depth of beams and the size of columns to secure warehouse space while satisfying the building height restrictions of the law – Minimize floor deflection and vibration – Also the structure must be clean without protrusions as there is no finishing material on the face of columns

Office building in Hernani

MC2 Ingeniería – Spain

The building is the headquarter of the Orona Lift Industry, as well as the central point of a new campus creating a place that is both a flagship and a common home for its more than 4,500 employees and a hub for researchers and students on its vertical transportation, urban mobility, energy and technology branches.

Office building in Turin

MJW structures – Italy

The building is the new headquarter of the Intesa San Paolo bank, resulting from the merge of Intesa and San Paolo banks.

Composite connections and composite slab

Engineer appointed by Gerdau – Brazil

Innovative tests related to performance were carried out in partnership with a Brazilian University (UFMG) to test composite connections and also with a laboratory in England to test composite slabs at elevated temperature.

Office building in Nove Lima

Engineer appointed by Gerdau – Brazil

The composite solution was chosen considering not only the optimized best technical solution (building height, gravitational/lateral forces applied, lateral resistance system adopted), but also the total cost, erection time-consuming and time to get the raw material from providers as well.

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here