Footbridge Toolkit

ArcelorMittal – All Regions

  • The footbridge toolkit provides an integration of products and services, establishing an ecosystem in the production chain.
  • The economic impact is reduced by up to 25% (comparing with baseline solutions) and the time and physical space for interventions are reduced, mitigating / eliminating risks for the team and third parties.

Characteristics

Activities (and products) carried out to reduce the total erection time :

  • Step #1 | Foundation – Use pre-assembled welded rebars with steel permanent formwork
  • Step #2 | Mesostructure – Use of precast columns
  • Step #3 | Ramps – Composite structure (steel deck and steel beams – built-up sections)
  • Step #4 | Footbridge – Composite structure (steel deck and truss / steel beams – cellular or angelina beams)

Applications

  1. Valparaíso de Goiás (GO) – 1 footbridge 2023
  2. Ribeirão das Neves (MG) – 1 footbridge2023
  3. Sinop (MT) – 1 footbridge 2023
  4. Espírito Santo – 8 footbridges 2023
  5. Marília (SP) – 2 footbridges (on-going) 2023
  6. Oriente (SP) – 1 footbridge (on-going) 2023
  7. Assis (1) – 1 footbridges (on -going) 2023

Categories

Restoration Solution, Road & Bridge

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here